Some midweek Weedbusting from Hoe Mill LockThursday, 12th November 2026The previous Saturday our brilliant volunteers had removed the most significant outbreaks of Pennywort between Hoe Mill and the Ricketts Lock weir. However, two of us knew that there was more hand picking that could be usefully done along that pound. And we happened to have the same day available to do it. So it was, feeling a bit of deja vu, that we met again at Hoe Mill Lock, moved the same kit that we'd used on Saturday onto the workboat, and with the engine misbehaving the way it had on Saturday, dropped the boat down through Hoe Mill Lock.
We knew where much of the Pennywort was - small strands and stray weedlets - and were straight to work. We didn't want anything left that will seize the opportunity to grow into a raft in the next few months (especially as PW seems to have extended its growing season).
Sharp eyes needed to identify Pennywort among and within floating leaves.
Steady progress down the south bank, with some sections clear and others - especially within both live and dying reeds - difficult to completely detach. That sneaky plant will come out to tease us next year! It will be back! But in much smaller quantities than if the work on it hadn't been done. A refreshment break helped to re-energise the Team of Two, and then progress was made as far as the weir. Time for a late lunch, and more recovery, before completing all of the north bank back to Hoe Mill.
Back up through the lock; back to Heybridge Basin to return the tools; then back home! Another productive day. Made more bearable by fine, if somewhat cold, weather. |
|
|
Weedbusting from Hoe Mill LockSaturday, 7th November 2026A change of location compared with the last few work parties. Mainly forced on us by the closure of the Long Pond due to Flood Barrier replacement. A 9 am start and the traditional pic of kit being loaded onto a work boat (if not the usual location!)
A great band of volunteers ready for the action.
It's always good to have another craft on the water, able to get to parts that other work boats can't reach.
These are the small strands that occupied much of his time.
As we had expected, there was no shortage of pennywort. Our plan was to prioritise the larger rafts.
Much-needed volunteers on the bank ready to take Pennywort from the work boat.
It was busy work taking Pennywort on board and not letting small strands get away.
There was no shortage of Pennywort that needed to be removed. Here's one example of many between Hoe Mill and the Ricketts Lock Cut.
Using the 'tow to bank' technique can be a really useful technique. Especially if we can have someone both on the boat and on the bank!
Fair to say it was tough work for those on the bank hauling up the Pennywort away from the water. Hard work on the boat too. Time for a break in a very convenient location and with plenty of warm sunshine. And time for a cultural discussion!
Then more of the same - towing the rafts to the shore for the shore party to deal with. Then, with the impressive effort put in by everyone, time to do the final clear up.
Finally a trip downstream to understand why we'd decided not to tackle the Pennywort Rafts in the Ricketts Lock Cut.
Then the journey along all of this pound back to Hoe Mill
To look for dinghy-man on the way
And find him!
Another valuable work party, involving some hard work for which we are again grateful. The main rafts of Pennywort between Hoe Mill Lock and the Ricketts Lock Cut all removed. |
|
|
Boom again!!!!Thursday, 5th November 2026This boom was different to those booms heard later on this Bonfire Night! It was the third, and final for the moment, replacement of the yellow booms we've previously used with much stronger materials, made possible by a successful grant from Essex and Suffolk Water. A visit by one volunteer the previous day meant that the outboard engine would start and that the heavy equipment was in place. Although much more fit for purpose than the previous boom, this new boom is very heavy and needs a big enough vehicle and a strong enough courier!
We wanted to get this last replacement in place before the potentially worse winter weather sets in. As the boom we were heading off to replace was at Beeleigh it would have been much easier if we'd been able to use the Heybridge Work Boat and travel up the Long Pond. However, Flood Gate replacement further down the Long Pond meant that rather than travel up from Heybridge Basin we needed to travel down from Hoe Mill. Three locks rather than no locks. So, the start of today's work was collection of the rest of the kit from Heybridge and by car to Hoe Mill to load up the workboat there.
Then it was down through Hoe Mill Lock. Here it is being refilled before we headed on.
Down through Ricketts Lock. Here's some pennywort being collected to stop it going further downstream.
Lovely Autumn colours but not sure why we were concerned about a small amount of Pennywort at Ricketts Lock. Just look at it either side!
And, nearly there, down through Beeleigh Lock, collecting a shopping trolley in the lock. It wasn't just any shopping trolley, it was a Marks and Spencer shopping trolley.
The first task, prepare the area where we needed to work by removing reeds and muck
Then we could see the extent of the 'old' boom.
A previously-installed metal eye on one side was still fit for purpose. A new ground anchor was needed on the other side. Lucky there was some muscle available!
Fitting the eyes on the section that will be chained to the metal shuttering,
With two sections joined together and floating here's another section being bolted on.
Three sections in place, the other side of the boom could be chained to a very secure ground anchor. There's going to be a lot of force on that boom in the winter months.
And finally the new boom is in place. Looking pretty smart!
A longish trip back to Hoe Mill, but not before helping our friends at Essex and Suffolk Water out by removing some Pennywort from inside their boom around the Eel Screen at the Langford Water intake.
Almost the end of the journey - approaching Hoe Mill Lock; with trolley.
A tribute to our volunteers that they've replaced all four booms ready for the winter. |
|
|
Boom Boom!!!!Thursday, 22nd October 2026The second in a series! Our next outing to replace failing boom with a much stronger product. Tools, equipment and materials were collected by two CCT volunteers, taken to Sandford and loaded onto the work boat. We are so fortunate to have a volunteer who willingly brings the widest range of tools and equipment - the task would be much more difficult without them. The plan was to meet at Sandford and use the Raider to travel first to Cuton Lock where we have a boom across a ditch that feeds into the Navigation just below the weir. Then up the Sandford Mill Stream to work on a boom where a ditch feeds into the Mill Stream. Both booms are in place to prevent any stray pennywort from the streams getting into the main system. It was a good day to be out on the Navigation!
Getting down through Cuton Lock was a bit of a challenge - the top gates were difficult to seal. But eventually we moored up in the weir stream and took a look at where we'd be working.
A clear area in which to work - and in which to do future maintenance - was needed. We had just the right tool for the job! And waders!
Next, removal of the old yellow boom. Not as degraded as some of the yellow boom in other locations. Probably as it had been more shaded.
Somewhere in there is a long metal anchor - a custom made length of rebar that a shackle can be attached to - that the new boom is chained to. We are pleased with the fact that despite floods and high water flows all of our anchors have stayed in place.
Attaching the chain to the anchor.
Stretching one section of boom across the ditch - just the right length,
And job done!
Time for a welcome break to have some lunch and re-energise. Then back up to Sandford
And up the Mill Stream. That overhanging tree looks intimidating
But nothing that a bit of determination and a long-reach chain saw couldn't overcome. Less pictures now as the photographer had to do more holding of the boat in place in order to work between the overgrown, brambly, banks. Again, once we had found the securing points of the original anchors in the undergrowth we could reuse them. Here the securing rings are being attached to one section of boom. Once attached by chain to the bankside anchor another section will be bolted on.
Here's the end of the second section being attached to the anchor on the far side.
Eventually, job done!
Time to just nip back down the Mil Stream, tie up and go home.
If only it had been that easy! Maybe the smoke from the engine on start-up was a warning! About half way down the mill stream one engine failed, Change to the other one. That also failed. We guess it was good luck that we'd previously found an oar in some of the debris! It meant that we could row on both sides. If you've ever tried rowing a boat of that size and weight you'll know how much effort is required. But eventually we got back! What a day!
|
|
|
Boom!!!!
Thursday, 8th October 2026 |
|
|
Yet more weedbusting on the Long PondSaturday, 3rd October 2026A Chelmer Canal Trust Work Party always involves an early start for some, and today was no exception. Two of our fine CCT volunteers were at Heybridge Basin at the crack of dawn in order to collect tools and equipment and ferry them up to the Tesco Fullbridge Landing Stage where the rest of the work party would meet. Everything packed it was time to set off.
Irritatingly, just the other side of Wave Bridge, there was loads of Pennywort all over the river, looking like it had been chopped up by passing boats. There was time to collect up some of it on the journey up to collect the other volunteers, and to collect more on the way back.
Four more fine volunteers were waiting at the Landing Stage. Today, a check that our volunteers are fully aware of the various requirements and safety issues associated with Chelmer Canal Trust Work Parties.
Then down to work, clearing the stretch of the Long Pond between the two main road bridges.
Always good to have our trusty coracleman in the water too.
Eventually it was time to offload the first pile of Pennywort.
And also time for a well-earned break.
After the break time to tackle the other side of the canal between the two bridges.
And having amassed even more Pennywort to unload even more.
Some volunteers really do go above and beyond the call of duty! (on hands and knees retrieving small strands!)
Eventually it was time to finish today's work party by taking the volunteers back to the Tesco Landing stage and then heading back to Heybridge.
|
|
|
Even more weedbusting on the Long PondSaturday, 5th September 2026We were back there again! If there's a location for Pennywort that is testing our patience this year it's the Long Pond. Perfect conditions for Pennywort - slow moving water that warms up more than the faster-flowing water in the river; plenty of sunlight; loads of places where we haven't been able to get back to the source of strands of pennywort so it keeps growing out from the reeds. As usual, an early start for two of our volunteers. Preparation is the key! Then off up to Beeleigh.
Taking opportunities on the way to grab any Pennywort that was silly enough to show itself on the way.
Good to meet more of the team and make plans for the session. Then the real work began! Three volunteers on the workboat, two in the water and two on the bank. Plenty of collecting to be done from the work boat
Plenty of Pennywort to be dealt in evidence.
And plenty to be delivered to our volunteers on the bank.
The bank team were kept busy hauling out Pennywort
While the crew on the work boat had plenty to do too.
Having volunteers in the water really has an impact
Getting to parts the work boat might not reach and dealing with Pennywort that's been missed.
With lots of valuable work done time to return to base. Why swim when there's a tow available?!
Time for refreshments. What a cheerful group!
Then time for more work.
With the divers doing more great work.
One more, final, offloading
Then back to base for some. And time to head back to Heybridge for others,
That section of the Long Pond is looking a whole lot better. Great work guys!
|
|
|
Additional Weedbusting at the Hoe Mill Weir StreamThursday, 13th August 2026This was going to be a challenge! And huge thanks to those amazing volunteers who turned up to do this physically-demanding work on what was going to be another of those 'hottest days of the year'. The challenge was a large raft of pennywort completely filling a pool beside the Hoe Mill weir stream. Two of us had been there two weeks previously, planning to deal with it. But it was too big a task for us to undertake on our own. So, the plan for today was to take advantage of a visit by our Herbicide-spraying contractor. His preference is always to hand-pull where it is possible and we knew from previous experience that he's not averse to getting in the water in his dry suit and hauling out weed that volunteers on the bank can deal with. Plenty of equipment and kit needed so we took a work boat up to the automatic weir, moored it there and walked down beside the weir stream to the location we would be based at for the rest of the day. First task, ensure we had adequate access to the site.
And take in the enormity of the task!
Next, clearance of an area where the pennywort removed from the pool could be dumped.
With this raft of pennywort being so lush, consolidated and heavy there was no way that simply tugging at it from the bank with cromes was going to work. So, as planned, into the water and ready on the bank for what was going to be some long and physically-demanding work.
Then the start of the tough work in the hot sun.
Progressively the huge raft was attacked and large chunks were pulled away from the water's edge.
It needed three strong people to drag the heavy weed out of the water and up the bank.
As the open-water area was opened up larger rafts could be towed in.
And dragged away from the water.
So much tough work deserved a break. Amazingly, despite so much hard work in the hot sun spirits remained high!
Back to the task in hand with potentially half of the raft remaining.
Nearly all of which could now be brought closer to the shore.
Finally, with the net being used to scoop up any stray fragments, this pool had been cleared.
Time for a lunch break!
And whereas the main task had been completed we were only part way through the work that was planned. We knew that further down the weir stream there were odd strands and the occasional smaller rafts of pennywort that, if left, would continue to infect areas further downstream. So, if the job's worth doing..........! Two now in the water and three on the bank we all played our part in ridding the weir stream of any further pennywort we could find.
Having completed that task even now our work wasn't finished! Next, the important work of the herbicide-spraying of pennywort that was intertwined in bankside vegetation. Being a systemic weed-killer it tracks back through the plant and potentially kills it at source. So rather than tugging away at strands of pennywort that snap, leaving some of the original plant in place, it is more efficient to leave a small amount of growing pennywort and spray its leaves.
By the way, if there is any concern about the use of herbicide, the application is made at a low concentration, carried out by a qualified contactor and this work is approved by the Environment Agency and Essex and Suffolk Water. Finally (well not quite finally as it turned out!), all the kit taken back to the boat and the return to Hoe Mill.
Just when we thought we'd finished, a quick look around the weir pool revealed some pennywort in some reeds - that will need to be dealt with on another visit. And an irritating raft we could see under the road bridge. It looked like the only way of getting to it would be by boat (and it was far too late to lock the work boat down). But yet again our red poles came into their own!
Another hard-working work party under arduous conditions. But we got it sorted! |
|
|
Weedbusting on the Long PondSaturday, 1st August 2026The recent recce along the Long Pond a week before today's work party had shown that there were a few burgeoning rafts of pennywort that, if left, could become much more problematic. Unfortunately, even the intervening week between seeing it and getting to it, during the extended period of warm weather and slow flow, allowed many of those burgeoning rafts to become full-fat, added sugar, protein rich (etc!) lush, heavy, large healthy rafts of pennywort! However, we didn't find that out until we got to them on this work party. But to start at the beginning. For three of our volunteers it was that "Damn! Do I have to get out of bed this early at the weekend" experience yet again, it being the first Saturday of the month and thus the day of a Chelmer Canal Trust Work Party. Off to Heybridge Basin to get the equipment ready, the refreshments sorted and the work boat loaded with everything that would be needed - and maybe a little more just in case. With the sun already feeling pretty strong it was time to head upstream.
Travelling up to Beeleigh and passing strands or rafts of Pennywort goes against the grain so there was some opportunistic 'grab and go' on the way. The further the team travelled the bigger the rafts got. And passing them without dealing with them wasn't natural.
Insufficient time to deal with all of the rafts of pennywort, but there was nevertheless a good amount to be offloaded before arriving at Beeleigh.
And what do you know?! When the workboat arrived at Beeleigh, work from the dinghy was already underway. Such commitment.
A plan was hatched of how and where everyone would work, And then modified to make the operation as efficient as possible. Initially the crew on the work boat would haul pennywort onto the workboat while the team on the bank would haul directly to the bank.
But it didn't take many rafts being pulled on board before the work boat needed unloading.
So a hybrid plan was developed with the work boat being used to take on pennywort directly but also to tow and push large rafts to the shore to be dealt with by the bank team.
There was some friendly dispute about who was working hardest - the crew on the work boat hauling pennywort on board and then pushing other rafts of pennywort to the bank. Or the team on the bank having to haul ashore these unrelenting rafts of pennywort that kept arriving.
It's fair to say that some really love pennywort (especially when it will head home to be added to our volunteer's compost heap!)
One of several unloadings of the work boat
Before, absolutely deservedly, heading back to base for a break and some very well earned refreshments. Collecting on the way our volunteers who had been working carefully down the banks removing the strands that had been left behind.
A break at that point was so important - our volunteers were working hard in the hot sun. But once the drinks were made and the snacks eaten they didn't look too worse for wear!
It was clear that we wouldn't be able to deal with everything that was there. But we were going to give it our best shot. So, a slight re-arrangement of personnel and back to the tasks in hand.
More hard work. More dedication to the cause! However much pennywort had been removed, however much there was left, our valiant volunteers had worked very hard. Back to base, collecting our other volunteers on the way, to declare the end of today's work party.
And then the long slog down the Long Pond to return the equipment and the work boat to Heybridge.
What would we do without our amazing, loyal, volunteers?! |
|
|
On the Look Out for PennywortSaturday, 4th July 2026As in June, the majority of the Chelmer and Blackwater Navigation continues to be free of Pennywort. And two days ago our contractor, paid for by Essex and Suffolk Water, used herbicide spray to deal with Pennywort in those few places where we've been unsuccessful with hand-pulling. Which meant that again we had time to go searching for places we've never visited where Pennywort might be present. Surrounded by, and in many places covered by overhanging trees, the Ricketts Lock Weir Stream has been a mystery to us. Even flying a drone over it hadn't helped. So our task, which we were pleased to accept, was to head onto the island and survey the weir stream. Most set off from Hoe Mill Lock on the Raider. First dropping down through the lock
And then heading downstream on what has to be said was an excellent morning.
While our diver colleagues drove round to Ricketts Lock (to save lugging kit around unnecessarily). This was a good call as we met someone who could arrange access to the private land thee edge of which wanted to survey. Our Raider friends arrived just at the right time.
Then for some it was off up to the weir on the Raider to start surveying from the weir end of the weir stream
While others on foot started their survey from the downstream end upwards.
We accessed the water where we could
In some places it being easier than in others.
Pleasingly, until this point, we hadn't found any Pennywort - and we'd been able to look at typical places where, if there was any around we would find it. But we didn't! Until one point where we found just one strand of healthy pennywort.
That felt good, until we then met up with the pair coming downstream.
Their news wasn't so positive. They'd found plenty of Pennywort at the foot of the weir. Damn! Oh well, maybe time to return to base for a break and then deal with that afterwards.
It was a long walk to the start!
But worth it. The refreshment break was appreciated.
After that, an early finish for some. And a trip back upstream to finish the Pennywort below the weir.
And then opportunistically on the way back to seek out small strands of Pennywort that had been spotted on the way down.
Almost back to base
Another really useful work party. Another breeding ground of Pennywort dealt with. We're getting there! |
|
|
Not Weedbusting but Clearing VegetationSaturday, 6th June 2026With so much of the Chelmer and Blackwater Navigation free of Pennywort we had time to deal with other issues. Two groups working in different locations. But both with two common aims. To cut back vegetation and to paint protective coatings. Team 1 met at Hoe Mill. Their task was to go upstream to Dudley's Bench. Dudley Courtman was a true friend of the Navigation and we want to ensure that his memory is preserved. The tasks were to clear encroaching vegetation, and if the weather had allowed it, paint wood preserver on the bench. The weather didn't cooperate and only the former was possible. There was no point in taking anything but the vegetation-clearing equipment.
Even getting two boats through the lock cut was a challenge. Blanket weed and propellors don't go well together!
Of course, keeping up high revs and a good speed can stop blanket weed fouling the prop!
Arriving at the bench's location it was clear that there was plenty to do.
So, work soon got underway.
Meanwhile out on the water there was a bit of pennywort-patrolling going on.
Still plenty to do around the bench
And then some quality control
Before welcome refreshments in the rain
An excellent morning's work
And a return to base, again in the rain
Team 2 met at All Saints Church, Springfield Green. It's a while since we've been there to check out Richard Coates's tomb. Richard Coates was the Resident Engineer on the Navigation, responsible for overseeing its construction. Without him there would potentially be no Chelmer and Blackwater Navigation. A regular visit means that we can keep the encroaching vegetation under control and ensure that the grave can be seen. When we arrived the vegetation was not as bad as it has been, but still needed some tidying up.
Team 2 also experienced the rain. But the work must go on.
Not just maintenance of the vegetation, but also of the metalwork. Those finials won't paint themselves!
The work continued, and so did the rain.
But eventually we were done and the tomb and surrounding ironwork were in a better state than when we'd arrived.
A job well done.
Time to pack up and join the church's gardening team for some very welcome refreshments. |
|
|
Weedbusting between Beeleigh and the Hoe Mill Weir Pool.Saturday, 2nd May 2026Thankfully, despite it being a Bank Holiday weekend, several of our loyal volunteers were up for the monthly challenge. And how valuable was it?! We've visited these locations regularly in the past few months. Loads of Pennywort has been removed. But there are always the sneaky little 'get aways' that we don't spot and which wait for optimum growing conditions. Which is about now! Every emerging plantlet we can remove now potentially saves us having to remove the large rafts it has become later in the summer. Here's an example of the sort of thing we were after. And we were able to find loads.
As usual, an early start from Heybridge.
And time to collect a few strands of Pennywort, here tangled up in other vegetation as so much is.
Three volunteers joined at Beeleigh and it was then on up through Ricketts Lock to Hoe Mill, looking on the way up for what we needed to collect on the way back!
Why were we heading so far upstream? Good question! Because there had been a report of a raft of Pennywort in the Hoe Mill weir pool. And the raft was potentially inaccessible from the bank. It certainly was a lovely day to be out on the Navigation!
Taking our workboat Buster into the Hoe Mill weir pool was going to be a challenge! We'd been there in a Raider before, but this was a first for Buster! And, with care and plenty of testing of the depth we got under the bridge, under a low-hanging branch, and into the weir pool.
Which was worthwhile as the raft that we'd come to deal with was hiding in some overhanging trees, would have continued to grow and could potentially have broken away and infected the pound below Hoe Mill which, as we had seen on the way up, was currently mostly Pennywort-free.
We were also able to deal with a further small raft that we found on the way out. An interesting view of the weirs in the weir pool.
We'd got in, so surely we should be able to get out?! We did, but only just!
Next, back down towards Ricketts Lock, thankfully confirming our observations on the way up that the upper nine-tenths of this pound is free of visible Pennywort. We were so pleased, and felt that we had done so much good work, that we stopped for our mid-morning break! The cattle in the field on the other side of the Navigation didn't seem best-pleased!
But that didn't affect us!
Break over we embarked on the serious task of small outbreaks of Pennywort along the north bank of the Ricketts Lock Cut.
That task complete it was then down through Ricketts Lock
Plenty of Pennywort to collect just below the lock, then more work further down, by now needing to prioritise any outbreaks that would cause most problems in the future. Including of course, above the Langford Water intake.
One more lock to go down through, Beeleigh.
And then we were back to the meeting point where we said farewell and thank you to three of our amazing volunteers while those on the work boat continued down to Heybridge Basin to store the tools and shut the boat down. Another valuable work party!
|
|
|
Weedbusting mainly above Ricketts Lock.11th April 2026Longer daylight hours, warmer temperatures. The weather that dormant Floating American Pennywort has been looking forward to. If we can limit the amount of juvenile Pennywort that's around now we'll save a considerable amount of work later in the year. So, for today's work party, off to the lock cut at Ricketts Lock which we knew needed attention. A long journey requiring an early start from Heybridge.
Arriving at Beeleigh Lock further preparations were being made!
With all of our volunteers ready to go we set off up towards Ricketts Lock.
A wise move to clear the debris, including some Pennywort, from Ricketts Lock before draining it.
And never ones to miss an opportunity the divers were hard at work before we even got the workboat through the lock!
And they valiantly continued up either side of the lock cut.
Looking for small strands and start-up rafts.
Coracleman Steve was deployed further up the cut while the crew on Buster headed further up the river to deal with some burgeoning rafts that had helpfully been reported to us. There was plenty to do!
A great sight when returning to the lock - everyone still hard at it.
What gets brought on board eventually has to be offloaded!
Lots of very effective work having been done, as much Pennywort cleared as we could, the sunny day having changed, for a while, to a chilly one, it was time to drop down below Ricketts Lock and have some much-needed refreshments. We were just warming up at this stage.
Thankfully we warmed up and got more cheerful!!
After our break we headed back down to Beeleigh.
There was more work to do on the way,
Lucky we have the resources to deal with all locations!
Teamwork is always appreciated!
Another section cleared - although there will inevitably be some regrowth when we return. So, time to head back to Beeleigh.
Time to say goodbye to most of our volunteers. And for the final pair to slog back to Heybridge.
|
|
|
Weedbusting along the Long Pond.Saturday, 7th March 2026Despite the many hours we've spent removing pennywort along the Long Pond there are still small strands sitting around innocently, waiting for warmer weather and longer days to spur them into the quick growth which is characteristic of Floating American Pennywort. The marginal vegetation having died back over the winter, this time of year offers the opportunity to remove pennywort that will otherwise come out of hiding with a vengeance in a month or two. Thankfully we could call on our loyal volunteers to pitch up and work hard at yet another Chelmer Canal Trust work party. The early team were at Heybridge Basin bright and, well, early, ready to head off on the first work boat to get to the second.
Not unusually we had to fuel-up the second boat before getting going.
A portable pump makes removing the water from inside the boat much easier!
All of our volunteers were ready and waiting at Beeleigh and it didn't take much time to sort out the plans for today's session. Most would head down the Long Pond to deal with the considerable amount of juvenile pennywort.
The Langford Cut has been one of our most-hated locations for many years. Difficult to access through prickly and tangled vegetation, smelly and muddy, and with ill-defined edges. And a breeding ground for pennywort that can then find it's way into the Long Pond. We've had recent success as a result of some very effective work with herbicide application (which we try to avoid). We wanted to see how much pennywort, if any, had survived the winter and the herbicide. Compared with previous years it wasn't bad! There was definitely some new growth, but we've seen it much worse. Of course, if we can get at it we're not going to leave it!
There was some pennywort that frustratingly just couldn't be reached from the bank. Time to call in coracleman Steve who can reach the parts that others can't.
Meanwhile, the main group was making steady progress down the Long Pond.
The work done by the divers is invaluable - getting in to the nooks and crannies that can't be seen from higher above the waterline.
The team on Buster were making their valuable contribution too.
As usual, and understandably after such hard graft, there were no complaints when it was suggested that we take a break for refreshments. The Banana Bread went down well!
And it was a happy group who posed for the traditional Group Pic.
But that was just a break. Back to work after a bit of re-shuffling of personnel!
More of the same, but further down the Long Pond.
Finally we reached the limits planned for our work today. Time to finish up and return most of the volunteers to their starting point.
And for the rest to head back to base to unload the equipment, clean up and head for home.
Yet another successful Chelmer Canal Trust work party. Renewed thanks to our brilliant volunteers. |
|
|
Weedbusting along the Long Pond.Saturday, 7th February 2026.As happens on an annual occurrence, the winter weather had had a major effect on the Navigation. Flooding and ice had displaced or degraded Pennywort. Meaning that we couldn't be sure that there would be much to do. With the prospect of bad weather on the planned day of this work party, and the reduced amount of known pennywort meaning that there might not be much to do, we cancelled the work party. Getting volunteers along to not do very much isn't our style. However, we were aware of some rafts of pennywort along the Long Pond which were unlikely to move and which could usefully be dealt with before they started growing more vigorously as the growing season approaches. So four volunteers came together to do the work. As it turned out, exactly the right number. Preparations over and Buster, our jointly-owned work boat, loaded it was time to head off up the Long Pond. A familiar first pic of a work party but definitely not the usual skipper!
The Long Pond was clear as far as Heybridge Creek and it was only after the next road bridge that we started spotting small strands of pennywort. Some only a small leaf and stalk. But all four volunteers are experienced and know that any one of these almost insignificant samples have the potential to grow into a huge raft later in the year. So, tedious as it might have seemed, our tenacious volunteers lifted them out. Enthusiastically!
Our technique changed when we got to places where pennywort was growing in and through mats of grass and cress. Pragmatically, tough as it was, an effective technique was wholesale removal of all of everything.
Using that technique meant that it wasn't long before the work boat needed to be offloaded.
And not just offloaded once. Our volunteers worked as a team so successfully that many rafts of mixed vegetation were removed. So there were several off-loadings. Tough work deserves rewards and, although only a token expression of our gratitude, it was good to get some refreshments during a relatively short break.
Then back on task. More vegetation. More off-loading.
Finally our work at this location was over and we headed back downstream. On the way we thought we'd spotted in the water the type of portable fishing platforms anglers use. There could be a fishy tale about how it got there, but what we removed from the water, preventing it damaging passing boats, was definitely not angling kit.
Please let us know if you can give a reasonable explanation about how a glass dining table got to be in that location. It's not as though we have 'Gin Palace' type boats that far up the Long Pond! On down the Long Pond. But not directly to base. There were two narrow boats moored along the Heybridge Basin south bank moorings where pennywort was growing between the boat and the bank. That couldn't be allowed to remain!
Finally, back to Buster's mooring. Stowage of equipment and off home. Great work by our volunteers which will have a significant impact later in the year.
|
|
|
Weedbusting along the Long Pond. Or notSaturday, 3rd January 2026We pride ourselves on running a work party every month, and aiming to do so whatever the weather. Despite the fact that we knew two of our regulars couldn't take part the initial indication for this work party was that we'd still have sufficient participants to crew two work boats. But then illnesses struck and personal transport failed. Nevertheless, despite the cold weather, three volunteers made it to Heybridge, meaning that we could operate one work boat. Equipment was put on board and the journey out into Heybridge Basin and up the Long Pond began.
It was clear from the start that this was going to involve some tough conditions.
Our work boat Buster became an icebreaker.
The hope was that conditions would get better. But they didn't.
So with great reluctance, and totally understandably, the decision was made to abandon this work party and turn back.
A valiant attempt to get some work done. A frustrating decision to have to turn back. But the best one to make. Thanks to our three brave volunteers.
|
|
|